Skip to content

EPC tender for Mpatamanga, Malawi

The Mpatamanga Hydro Power Limited (MHPL) announced the official launch of the tender process for the selection of the EPC (Engineering, Procurement, Construction) contract of the Mpatamanga Hydropower Storage Project in Malawi.

Employer: Mpatamanga Hydro Power Limited (MHPL)
Project: Mpatamanga Hydropower Storage Project
Contract: The Engineering, Procurement, Construction, Testing and Commissioning Contract of the Mpatamanga Hydropower Storage Project (“MHSP-PCSA-RFP”)
Country: Malawi
Loan No: IDA Grant E4480-MW
RFP No: MW-MHPL-571342-CW-RFP
Issued on: September 15, 2026

The Mpatamanga Hydropower Storage Project is located on the Shire River, the largest river in Malawi and a tributary to the Zambezi River, and situated in the southern region of Malawi, within the Blantyre and the Neno Districts.

The Project is co-developed by the Government of Malawi, EDF, SN Malawi BV and IFC under a Public-Private Partnership scheme. MHPL is the Special Purpose Vehicle (SPV) established in 2022 to develop, finance, construct, own and operate the Project. MHPL is the Employer for the Project.

Submission deadline: 13 November 2026.

More information in the full document.